Slow progress

Just about done with the Dodge intake project. I need to get the truck running to free up the garage spot so that I can do my winter maintenance on the family Jetta and winterize the ’54 Champion.

I just received my new ring gear from Dave T. I’m away all next week, but I’ll be taking it to the trans shop as soon as I get back.

Dave also sent me a nice rebuilt PS ram. I’m looking forward to rebuilding the control valve. With that done I’ll have all the bits in place to do the install. I’ll install the ram, bellcrank, and control valve before the engine goes back in and the front end is all open.

Meanwhile I am getting a bit done on cleaning up the engine compartment so I can paint before the engine goes back in.

Leave a Reply

Your email address will not be published. Required fields are marked *